The Bowen Project
Log Build at Front Door
This will be the opening for the front door with a window along side as viewed from the inside. To the left is the garage (slab is not poured yet). A conventional interior wall will be built between the entry and the garage.
Need more info?
E-Mail to info@sierraloghomes.com
This web site hosted by LogHomes.com